Distinguish production screening from qualification
Production tests screen individual units against defined limits. Qualification evaluates a design and manufacturing process through an agreed stress plan and acceptance criteria. Neither a temperature range nor a package type establishes completed qualification.
Preserve traceability across transformations
A useful genealogy connects wafer and die identifiers with assembly lots, test program revisions and shipping records. Define which records can be supplied to a customer and the retention period. Traceability is most useful when it supports a specific containment decision.
Close the failure-analysis loop
Agree on return handling, electrical confirmation and analysis escalation before volume production. Preserve configuration and operating history with failed units. Change notification and requalification criteria should be part of the supply agreement.
