FROM DIE TO SYSTEM

Test, traceability & reliability

Translate design intent into measurable release criteria. Connect wafer test, assembly controls, final test and field feedback.

Discuss your design
SYSTEM DESIGN PERSPECTIVE FuuVeXia Engineering
Test, traceability & reliability
Original concept visualization
SYSTEM VIEW

The complete signal path.

Conceptual functional architecture. External components and interfaces depend on the final system design.

01

WAFER TEST

→
02

ASSEMBLY CONTROLS

→
03

FINAL TEST

→
04

RELIABILITY REVIEW

Previous functional flow · retained
01WAFER TEST
→
02ASSEMBLY CONTROLS
→
03FINAL TEST
→
04RELIABILITY REVIEW
01 / ENGINEERING

Distinguish production screening from qualification

Production tests screen individual units against defined limits. Qualification evaluates a design and manufacturing process through an agreed stress plan and acceptance criteria. Neither a temperature range nor a package type establishes completed qualification.

02 / ENGINEERING

Preserve traceability across transformations

A useful genealogy connects wafer and die identifiers with assembly lots, test program revisions and shipping records. Define which records can be supplied to a customer and the retention period. Traceability is most useful when it supports a specific containment decision.

03 / ENGINEERING

Close the failure-analysis loop

Agree on return handling, electrical confirmation and analysis escalation before volume production. Preserve configuration and operating history with failed units. Change notification and requalification criteria should be part of the supply agreement.

DESIGN REVIEW

Make the requirements measurable.

Design considerationEvaluation focus
ScreeningTest limits and program revision
QualificationStress plan, lots and acceptance criteria
GenealogyWafer, assembly, test and shipment linkage
Change controlNotification, review and requalification

¹ Where shown: preliminary portfolio target, not a guaranteed production limit.

Before design-in

  1. Request the applicable qualification report, not a generic badge.
  2. Verify lot-to-shipment traceability on a sample record.
  3. Define failure-analysis responsibilities and response stages.